THE PROJECT SCOPE
From lifting plan
to installed equipment.
The surge vessel installation experience combines several closely connected activities: installation of the surge vessel and scrubber, prefabricated piping spools, structural works and pipe supports.
The scope also includes painting and touch-up works, the design and execution of a critical lifting plan, inspections and pre-commissioning. These activities require coordination across technical planning, materials, installation and inspection interfaces.
CAPABILITIES IN FOCUS
- Equipment installation
- Mechanical and piping works
- Structural works and pipe supports
- Critical lifting plan
- Inspection and pre-commissioning
EXECUTION SCOPE
The interfaces that matter.
A practical view of the activities described in the project profile.
01
Plan the lift
The critical lifting plan connects equipment handling with the site conditions and the installation sequence.
02
Install and connect
Equipment, prefabricated piping spools and associated supports are coordinated as part of the installation scope.
03
Inspect and prepare
Painting, touch-up works, inspections and pre-commissioning support progression towards the client’s acceptance requirements.

CONNECTED DELIVERY
Technical requirements.
Field execution.
The case brings engineering support and installation capability into the same delivery conversation. Clear scope boundaries, the readiness of materials and the sequence of activities all shape how the work can progress.
Discuss your equipment installation requirements with our team, including drawings, equipment information, site constraints and inspection arrangements.
Planning an equipment installation?
Share the equipment, drawings, site location and intended schedule so our team can review the technical and field interfaces.